Project Details
  • Project Name
    :
    SK Bharathi Apartments
  • Location
    :
    Jesubatham Nagar, Guduvanchery
  • Project type
    :
    Premium residential Apartments
  • Floor space
    :
    3613
  • Project overall size
    :
    10839
  • No. of Units
    :
    9
Specifications
  • Foundation: RCC Framed Structure
  • Flooring: Glazed Tiles Upto 7 Feet Height
  • Toilet: Colour Concept With Standard Sanitary Fittings
  • Kitchen: Platform Tiles for 2 Feet Height Above The Kitchen Platform
  • Joinery:
    • Main Door: Teak Wood With Varnish
    • Other Doors: Teak Wood Frame With Flush Door Painted
    • Windows: UPVC Sliding Shutter
    • Grill: Powder Coated Grills For Windows
  • Electrical: 3 Phase Connection With Required Light, Fan & Plug Points In All Rooms As Per Architect Plan and DB & ELCB with branded ISI Wires
  • Sanitation: Fixtures: Parryware/Make White EWC, Wash Basin, Toilet Fittings
  • Painting:
    • Internal Walls With Emulsion Paint With Touch-up Putty
    • Polish: All Other Doors And Grills With Enamel Paint
  • Lift: Lift Facility Available
  • General:
    • UDS Subject To Approval
    • 100% Vaasthu And 100% Vaasthu
    • Grill Gate As Main Door
    • Grill Shutters For Kitchen/ Wash Balcony (Extra Work)
    • Corporation/ Bore Water With 4000 Ltrs Capacity
    • RCC Overhead Tank & DC Power
    • Water Sump (12,000 Ltrs)
    • Recirculated Water Tank For Each House
    • RCC Overhead Water Tank For Each House
    • 6' 0" Bricks Compound Wall With Compound Gates
    • Corner Cloth Drying Area Provided
    • Rain Water Harvesting As Directed By Local Body Norms
MM Nagar Image
Project Location: SK Bharathi Apartments

Site Area: 4800 Sq.Ft.

Area Calculation Details

Flat Carpet Area A Plinth Area B Common Area C (C 25%) Total Area D (B+C) UDS (BX0.48)
A18009232301153443
A28709842461230472
A38709842461230472
B18009232301153443
B28709842461230472
B38709842461230472
C18009232301153443
C28709842461230472
C38709842461230472
Total 7,620 8,673 2,166 10,839 4,161
Common Area Calculation
STILT FLOOR STAIR / LIFT301
FIRST FLOOR STAIR301
SECOND FLOOR STAIR301
THIRD FLOOR STAIR301
STAIRCASE HEAD / LIFT ROOM301
OHT75
SUMP (12000 Ltr)100
SEPTIC TANK (24000 Ltr)180
TOTAL1860
COMMAN AREA ALL FLAT AREA1860 / 8673 % 21
S.No PAYMENT SCHEDULE PERCENTAGE
1Booking Advance10 %
2Commencement of Foundation20 %
3Commencement of Ground Floor20 %
4Commencement of 1st Floor25 %
5Commencement of 2st Floor10 %
6Commencement of 3st Floor10 %
7Commencement of Flooring Respective Unit2.50 %
8Handing Over2.50 %
Construction progress content goes here.