Specifications
-
Foundation: RCC Framed Structure
-
Flooring: 2' x 2' Vitrified Tiles
-
Toilet: Glazed Tiles Up to 7 Feet Height
-
Kitchen: Colored Glazed Tiles Upto 2' Height Above The Platform With Granite Top With Stainless Steel Sink
-
Joinery:
- Door: Main Door With Teak Wood Frame With Teak Paneled Shutter
- Other Doors: Flush Doors With Door Frame And Painted
- Toilet Doors: PVC Doors
- Windows: Powder Coated Aluminium Windows With Louver / Sliding Shutters
- Ventilators: Glazed Shutters / Toilets – Glazed Louvers & Sliding Shutters
-
Electrical: Three Phase Connection Required Light, Fan & Plug Points As Per Plan – T.V. & Telephone Point In Living And Bedrooms, Geyser Point In Toilets
-
Sanitation: Parryware Make White EWC, IWC, Wash Basin, Toilet Fittings Are ISI Mark Branded
-
Painting:
- Internal Walls Paint With Exterior Emulsion Paint
- External Walls Paint With Exterior Emulsion. Main Door With Polish; All Other Doors And Grills With Enamel Paint
-
Lift: Lift Facility Available
-
General:
- Loft And Shelves In All Bedrooms And Kitchen
- Safety Grill For Windows
- Grill Gate At Main Door
- Additional Water Wash Balcony (Extra Work)
- Dual Meter For Main And DG Power
- Brick Septic Tank With 24,000 Lts Capacity
- A Toilet At Stilt Floor
- RCC Water Sump (6,000 Lts)
- RCC Overhead Water Tank For Each House
- 6’ Height Compound Wall With Compound Gates
- 4’-6” Dia Borewell
- Common Cloth Drying Rod Provision At Terrace
- Rain Water Harvesting As Directed By Local Body Norms
Project Location: MAHALAKSHMI NAGAR EX. II, NANDHIVARAM
Site Area: 2580 Sq.Ft.
Area Calculation Details
Flat |
Carpet Area A |
Plinth Area B |
Common Area C |
Total Area (B+C) |
UDS |
A1 | 800 | 945 | 236 | 1181 | 430 |
A2 | 800 | 945 | 236 | 1181 | 430 |
B1 | 800 | 945 | 236 | 1181 | 430 |
B2 | 800 | 945 | 236 | 1181 | 430 |
C1 | 800 | 945 | 236 | 1181 | 430 |
C2 | 800 | 945 | 236 | 1181 | 430 |
Total |
4800 |
5670 |
1416 |
7086 |
2580 |
S.No |
PAYMENT SCHEDULE |
PERCENTAGE |
1 | Booking Advance | 10 % |
2 | Commencement of Foundation | 20 % |
3 | Commencement of Ground Floor | 20 % |
4 | Commencement of 1st Floor | 25 % |
5 | Commencement of 2st Floor | 10 % |
6 | Commencement of 3st Floor | 10 % |
7 | Commencement of Flooring Respective Unit | 2.50 % |
8 | Handing Over | 2.50 % |